Electricity

RNT Map

Map of the National Electricity Transmission Network.

Loading

Electricity Transmission Network Characterization

Length of the VHV lines, transformer capacity in the National Transmission Network’s substations, and indication of the number of installations.

  2022
LINES  
Length of Lines [km] 9 424
400 kV 3 075
220 kV 3 848
150 kV 2 501
SUBSTATIONS  
Transformer Capacity [MVA] 39 517
Autotransformers (MAT/MAT) 14 920
Transformers (MAT/AT) 24 277
Transformers (MAT/MT) 320
FACILITIES  
Substations 70
Step-down Stations 14
Switching Stations 2
Transition Stations 1

gas

RNTIAT Characterization

  2022
TRANSMISSION NETWORK  
Pipeline Length (km) 1 375
GRMS 86
BV 44
CTS 2
ICJCT 5
JCT 66
LNG TERMINAL  
No. of Tanks 3
LNG Storage Capacity [m3] 390 000
Regasification Capacity [m3 (n)/h] 1 350 000
LNG Maximum Capacity of Tankers [m3] 216 000
LNG Tanker Trucks Filling Station Capacity [m3 (n)/h] 175
UNDERGROUND STORAGE  
No. of Salt Caverns 6
NG Storage Capacity [Mm3] 332
Withdrawal Capacity [Mm3 (n)/dia] 7
Injection Capacity [Mm3 (n)/dia] 2
 

RNTIAT Map

Loading